This project includes replacement of the existing bridges over the Indian River going into Kennedy Space Center, due to structural deficiencies and the necessity for the safe and efficient movement of freight and launch materials. The improvements replace the 1960s drawbridges with fixed, high-span level bridges, showcasing modern design. Orion completed the first span four months early in 2023, easing spacecraft transport to Kennedy Space Center. Orion’s innovative approach and safety record shine as we progress ahead of schedule on this vital infrastructure project.
Collaboratively crafting the new NASA Causeway Bridge in Titusville, Florida, Orion proudly completed the first bridge ahead of schedule. Designed for spacecraft transport, the elevated structure replaces outdated bascule bridges, enhancing safety for the Kennedy Space Center. The project incorporates modern features like wider lanes, a 65-foot clearance, and a 3-degree incline.
Our innovative construction methods, including phased work on columns, pile caps, and deck pouring, allowed for efficient sequencing. Adapting to challenges, like working from barges, we preserved parts of the old bridge for material handling.
While prioritizing safety and maintaining an accelerated pace, our team is now focused on the second bridge, anticipating completion by early 2026.
With a strong partnership among project partners and a commitment to overcoming obstacles, we contribute to the success of this transformative endeavor in collaboration with the Florida Department of Transportation, WSP USA, and Volkert.
Orion marine
Orion played a crucial role in the NRD Habitat Restoration at Vigor Shipyard in Seattle. Our work included demolition of several structures, reconstructing a new pier section, new stormwater system...
In the Galveston Harbor project, our Dredge King Fisher deepened the channel to -50 feet, raised levees in Pelican Island DMPA (Phase #1), and improved San Jacinto DMPA levees (Phase #2)...
Explore Orion's success on the Eagleford Pipeline project, where we installed 2.2 miles of 16-inch pipeline in Corpus Christi, Texas. With advanced Horizontal Directional Drilling (HDD), precise...