Eagleford Pipeline Project

Explore Orion's success on the Eagleford Pipeline project, where we installed 2.2 miles of 16-inch pipeline in Corpus Christi, Texas. With advanced Horizontal Directional Drilling (HDD), precise excavation, and 24/7 operations, Orion demonstrated expertise in marine construction and environmental compliance.

PROJECT HIGHLIGHTS

  • Installed 2.2 miles of 16” pipeline across Nueces Bay in Corpus Christi, Texas
  • Implemented 2 Horizontal Directional Drills (HDDs)
  • Precise excavation for HDD punch-out template using ClamVision software
  • Provided marine support and excavation, utilizing crane barges and shallow water tugs
  • HDD support survey for foreign pipelines
  • Towed 1-mile sections of pipeline to excavation site for retrieval
  • Maintained 24-hour operations throughout the project
  • Adhered to all environmental requirements

Precision Excavation with ClamVision Software

The Eagleford Pipeline project, spanning 2.2 miles across Nueces Bay in Corpus Christi, Texas, involved the installation of a robust 16-inch pipeline. The complexity of this task was heightened by the incorporation of two Horizontal Directional Drills (HDDs). Orion played a pivotal role, executing precise excavation work for the HDD punch-out template using the innovative ClamVision software. This technology allowed for mechanical digging at the tie-in location, strategically positioned in the center of the bay.

Our comprehensive support and excavation efforts included the deployment of crane barges, shallow water tugs, and meticulous HDD support surveys for foreign pipelines. The logistical challenge of transporting 1-mile sections of the pipeline to the excavation site for retrieval showcased Orion's strategic planning and operational strengths. Operating on a demanding schedule, the project required 24-hour operations to achieve timely completion.

Orion maintained a steadfast commitment to environmental compliance, meeting all requirements to safeguard the delicate ecosystem of Nueces Bay. The successful execution of the Eagleford Pipeline project not only demonstrates our technical expertise in marine construction, but also underscores our dedication to environmental responsibility and project efficiency.