Who we are
Our strength lies in our people united as an integrated team with one mission that sets us apart from the competition.
Marine
We provide one-source solutions for projects above and below, on and off the water.
Concrete
Achieving high customer satisfaction, repeat business through consistent project management, quality work, and cost-effective completion.
Engineering
Schneider Engineering & Consulting excels in marine and civil engineering, delivering unparalleled solutions for diverse projects.
Explore Orion's success on the Eagleford Pipeline project, where we installed 2.2 miles of 16-inch pipeline in Corpus Christi, Texas. With advanced Horizontal Directional Drilling (HDD), precise excavation, and 24/7 operations, Orion demonstrated expertise in marine construction and environmental compliance.
The Eagleford Pipeline project, spanning 2.2 miles across Nueces Bay in Corpus Christi, Texas, involved the installation of a robust 16-inch pipeline. The complexity of this task was heightened by the incorporation of two Horizontal Directional Drills (HDDs). Orion played a pivotal role, executing precise excavation work for the HDD punch-out template using the innovative ClamVision software. This technology allowed for mechanical digging at the tie-in location, strategically positioned in the center of the bay.
Our comprehensive support and excavation efforts included the deployment of crane barges, shallow water tugs, and meticulous HDD support surveys for foreign pipelines. The logistical challenge of transporting 1-mile sections of the pipeline to the excavation site for retrieval showcased Orion's strategic planning and operational strengths. Operating on a demanding schedule, the project required 24-hour operations to achieve timely completion.
Orion maintained a steadfast commitment to environmental compliance, meeting all requirements to safeguard the delicate ecosystem of Nueces Bay. The successful execution of the Eagleford Pipeline project not only demonstrates our technical expertise in marine construction, but also underscores our dedication to environmental responsibility and project efficiency.
Orion marine
Orion played a crucial role in the NRD Habitat Restoration at Vigor Shipyard in Seattle. Our work included demolition of several structures, reconstructing a new pier section, new stormwater system...
This project includes replacement of the existing bridges over the Indian River going into Kennedy Space Center, due to structural deficiencies and the necessity for the safe and efficient movement of...
In the Galveston Harbor project, our Dredge King Fisher deepened the channel to -50 feet, raised levees in Pelican Island DMPA (Phase #1), and improved San Jacinto DMPA levees (Phase #2)...