Who we are
Our strength lies in our people united as an integrated team with one mission that sets us apart from the competition.
Marine
We provide one-source solutions for projects above and below, on and off the water.
Concrete
Achieving high customer satisfaction, repeat business through consistent project management, quality work, and cost-effective completion.
Engineering
Schneider Engineering & Consulting excels in marine and civil engineering, delivering unparalleled solutions for diverse projects.
Bermello Ajamil & Partners enlisted Orion for a peer review of Port Everglades Turning Notch project in Fort Lauderdale. Our team assessed design, schedule, cost estimate, and excavation alternatives, delivering valuable recommendations. The project involved constructing new bulkheads, toe walls, environmentally friendly bulkheads, extensive upland excavation and dredging, and a paved container yard.
Orion was engaged by Bermello Ajamil & Partners to do a comprehensive peer review of the Port Everglades Turning Notch project in Fort Lauderdale, Florida. The scope encompassed evaluating the design concept, project schedule, construction cost estimate, and excavation alternatives. The project itself entailed substantial construction elements, including the installation of 3,183lf of new deep-water bulkhead and fenders, 990lf of toe wall, and 1,600lf of an Environmentally Friendly Bulkhead. Additionally, it involved upland excavation and dredging spanning 26 acres, along with the construction of a 24-acre paved upland container yard.
Our team analyzed each aspect of the project, providing a detailed written narrative of review findings. The review extended to recommendations aimed at enhancing the overall value and efficiency of the Port Everglades Turning Notch endeavor. By scrutinizing the design, schedule, cost estimate, and excavation alternatives, we contributed valuable insights to optimize the project's success. The thorough examination facilitated a comprehensive understanding of the project's intricacies and potential improvements, highlighting Orion’s commitment to delivering impactful results.
Orion Engineering
With steel pipe pile-supported foundations, this Golden Pass LNG Flood Gate design included 30ft and 60ft gates, steel sheet piles as a protective curtain, and an anchored bulkhead wall linking to the...
Orion Engineering & Consulting led a Design/Build effort for a 100% design and construction of a fender system at the KCS railway bridge in Beaumont. The design featured robust steel assemblies with...
Orion was enlisted by the Florida Department of Transportation to replace the existing 1964 bascule bridge over the Indian River, crucial for SpaceX and Blue Origin launches. Our Engineering &...
Orion collaborated with the Port Authority of Jamaica to introduce the SEAWALK® System at Kingston Harbor's Port Royal, a "World Heritage Site." The project, fast-tracked to meet schedule demands...