Orion celebrated the early completion of the Point Hudson Marina restoration in 2023. This project was a testament to our efficiency and environmental compliance. Collaborating with the Port of Port Townsend, we replaced the north jetty, assisting in the betterment of the marina's future.
Orion successfully completed the initial phase of the Point Hudson Marina reconstruction project, allowing for an early reopening in January 2023. The project involved replacing the shorter north jetty, using Orion's crane and supply barges. The original estimated completion date of early March 2023 was surpassed due to favorable weather conditions, effective collaboration, and expedited piling removal and replacement.
Orion collaborated with the Port, permitting agencies, and consultants on problem-solving, as well as strategic planning. Lessons learned during the jetty work will enhance efficiency in the second phase of the project to replace the longer south jetty. Orion's improved techniques, such as efficient rock placement, demonstrate our commitment to continual improvement.
The reconstruction included installation of 178 steel piles, rising 16 feet above low tide level and surpassing the height of the replaced creosoted wood piles. Our workboats were strategically positioned for tasks like piling caps, and shoreline repair work was scheduled to address damage caused by high tides and winds in November 2022. The completed Phase 1 showcases the new jetty's functionality and serves as a testament to its role in safeguarding Point Hudson for decades.
Orion marine
Orion played a crucial role in the NRD Habitat Restoration at Vigor Shipyard in Seattle. Our work included demolition of several structures, reconstructing a new pier section, new stormwater system...
This project includes replacement of the existing bridges over the Indian River going into Kennedy Space Center, due to structural deficiencies and the necessity for the safe and efficient movement of...
In the Galveston Harbor project, our Dredge King Fisher deepened the channel to -50 feet, raised levees in Pelican Island DMPA (Phase #1), and improved San Jacinto DMPA levees (Phase #2)...
Explore Orion's success on the Eagleford Pipeline project, where we installed 2.2 miles of 16-inch pipeline in Corpus Christi, Texas. With advanced Horizontal Directional Drilling (HDD), precise...