skip to main content

Myrtle Beach Outfall Installation

Embark on a journey to Myrtle Beach, South Carolina, where Orion undertook the challenging 25th Avenue South Ocean Outfall Marine Pipeline Construction project. This project showcased our prime contracting expertise, installing 1,180 linear feet of a 60-inch-diameter concrete drainage line into the Atlantic. Completed ahead of schedule, this project is a testament to our marine construction excellence, enhancing Myrtle Beach’s public infrastructure.

Project Highlights

  • Installed approximately 1,180 linear feet of parallel 60”-diameter concrete drainage line
  • Submerged the drainage line into the Atlantic Ocean
  • Covered the submerged line with large armor stone
  • Performed excavation work
  • Installed the concrete pipe
  • Conducted testing procedures
  • Backfilled the excavated material
  • Successfully completed the project ahead of schedule

Diving at Myrtle Beach

Orion's role as the Prime Contractor for the City of Myrtle Beach Public Works showcased our expertise in marine pipeline construction. Encompassing excavation, concrete pipe installation, meticulous testing, and backfilling operations, this challenging project included the installation of approximately 1,180 linear feet of a parallel 60-inch-diameter concrete drainage line submerged into the vast Atlantic Ocean.